Carmel, IN today unveiled the Range Line Road Diet. For about half the length of the road it decreases the number of lanes from five to two, and installs a median the entire distance of the project, with wider sidewalks, a cycle track, and two ten foot ped/bike paths for shorter trips. Go Carmel!